Abstract
With the continuous expansion of the scale of construction projects, project risk management is becoming more and more important, especially the economic management risk as the focus of risk management has been more and more attention. From the engineering project, feasibility study, design, bidding, analysis of project bidding and construction stages of economic system risk, economic risk analysis and management of the project extends to the project proposal, feasibility study and economic risk of engineering project phase, occurrence regularity and control technique, and put forward the preventive measures and suggestions, provide the reference for the engineering project risk management and engineering economy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Engineering and Technology Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.