Abstract

This research aimed to identify the risk of the procurement stage of glass façade in the high-rise office building in Jakarta. In this research, the procurement phase is analyzed using the PMBOK reference (5th edition). The number of risks that occur during the procurement process can certainly hamper the project. These risks can cause to the project completion time that are not in accordance with the project schedule. Besides that, the risks could make the project cost even greater. This certainly can lead to big loss to the project. Therefore, it is very important to identify the main risks at the procurement stage from the beginning of the construction process. According to the PMBOK, the stages of the procurement is divided into 4, which consists of plan procurement, conduct procurement, control procurement and close procurement. Based on the research results, obtained 45 risks that are divided into 4 phases of the procurement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.