Abstract

A kind of risk evaluation method based on Analytic Hierarchy Process (AHP) and improved BP neural network is proposed in this paper. Importance degree of risk evaluation indexes is sorted by using the analytic hierarchy process and the risk evaluation index system is simplified, and then the simplified index acts as the input of improved BP neural network to evaluate the risk. This method simplifies the network model and improves the performance and calculation accuracy of the network. The risk of the power grid project is evaluated based on this method, indicating that this method is feasible and effective for the risk evaluation of the power grid project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.