Abstract
Abstract: Before the construction of Metro station, many accessory structures need to be constructed firstly, including shaft, Cross channel, and metro station pilot tunnel, etc. Many Engineering cases show that the risks of the circumstances around the Metro station caused by the excavation of these accessory structures are the major component of the metro construction risk. In this paper, the risk caused by construction of the metro shaft adjacent to building was studied, which located at the crossings of ziyou Road and Renmin Street, Changchun, China. Firstly, the major risk was introduced and the construction mechanic behavior was researched by using MIDAS/GTS finite element software package. Then, a control method was proposed to eliminate this risk, which was verified by using finite element software. Finally, the proposed measure was also validated with the result of construction monitoring for this project. This works focus on studying the excavation mechanics behavior of metro shaft and its influence on the around environment, and these conclusions are useful for providing a basis for similar project construction in the future.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.