Abstract
A power system risk assessment model considering the time-sequence characteristic of wind power ramp events is pro-posed in this paper. By sampling the possible shutdown time and operation state of conventional units, the effect of time-sequence relation between wind power ramp events and the outage of conventional units is considered. In the evaluation process, the correlation between time intervals is taken into account, and the operating risk of the system is assessed by with times of frequency off-limits and loss load expectation. This assessment result the impact of wind power ramp events on system operation risks and provides guidance for the dispatcher to take preventive and control measures, which has practical application and reference value.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.