Abstract

The building construction project is one of the activities that can pose a safety risk. Work safety risk assessment can be done using the Failure Mode and Effect Analysis (FMEA) method and looking at the Risk Priority Number (RPN) value. The purpose of this research is to take a case study of the building Office in determining the highest RPN and provide recommendations on its management. This project consists of 13 earthworks, passenger hoist, tower crane, scaffolding jobs, ironworks, formwork work, foundry work, mechanical, electrical plumbing (MEP) work, welding work, and floor wall doing works, and ceramic installation work. The highest RPN from the observations occurred in Iron Fabrication which can cause fingers hit by a bar cutter and bender. In this case, personal protective equipment (PPE) is significant in preventing these impacts from occurring in the project work area.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.