Abstract
Indonesia has a big dream of catching up with infrastructure development with other countries such as Malaysia and Thailand. The toll road as a pioneer of economic development in the future was built to connect Merak to Banyuwangi through the infrastructure of the Trans Java Toll Road. Gempol-Pasuruan, Pasuruan-Probolinggo, and Probolinggo Banyuwangi Toll Roads are the last tipping points and one of the concessionaires is PT. Jasa Marga Probolinggo Banyuwangi. Toll road construction is not free from limited infrastructure financing in Indonesia and the risks of this project disrupt project performance and affect the cost of the project, project time, and building quality. Soft System Methodology (SSM) method can help solve the problem of project risks starting from identifying the risks of project implementation and analyzing the risks that might occur. This research was conducted using the purposive sampling technique to collect respondent data from 3 toll roads and then analyze it with a probability risk test, consequence risk test, and soft system methodology (SSM). It can be concluded that the risk of obstacles in the mountainous region, relocation of roads that intersect with community social facilities is the most extreme risk which hinders the implementation of the construction of these 3 toll road projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.