Abstract

Introduction of the Present Value Distribution Model (PVD) offers an alternative method for the valuation of projects yielding intertemporal stochastic rents. A combination of concepts from many areas of the literature yields the given model. The base procedure relies on Monte Carlo Simulation with the application of recently established theories on stochastic rents, path dependent cash flow trajectories, and period dependent discount rates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.