Abstract

Treatment of road runoff is a requisite for any environmentally sound infrastructure design. However, investment and maintenance budget is often a limiting factor during the planning and the operation phase of such projects. In order to cost-efficiently decrease the loads of a wide range of contaminants that are usually present in road runoff (posing a long-term threat to the aquatic and soil environments), simple and robust techniques are sought for. The paper deals with the re-evaluation of two such processes, sedimentation and filtration, putting emphasis on using authentic runoff samples during the tests in order to properly characterize the performance of these easy-to-manage solutions in this specific field of application. The results presented in this paper are aimed to aid the proper design of low-cost, low-maintenance road runoff treatment facilities, serving with background information that can be used to ensure that the expectations for the degree of pollutant removal are surely met.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.