Abstract
ABSTRACT The primary aim of this research is to propose a revised triple sampling (TS) chart, where the derivations of new formulae for computing the average run length of the triple sampling (TS) chart correctly are provided. The secondary aim is to develop the revised TS chart with estimated process parameters. The revised TS charts are compared with the double sampling (DS) , two stage adaptive sample size (AS2) and three stage adaptive sample size (AS3) charts when process parameters are known and estimated using the average run length (ARL), average number of observations to signal (ANOS), average of the average run lengths (AARL), standard deviation of the average run lengths (SDARL), average of the average number of observations to signal (AANOS) and standard deviation of the average number of observations to signal (SDANOS) criteria, where the revised TS charts are found to be superior. Additionally, a table giving the minimum number of Phase-I samples for estimating the process mean so that the revised TS chart with estimated process parameters has the desired in-control AARL and AANOS performances is provided.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.