Abstract

A 648,000 GPD reverse osmosis (RO) facility at ERDA's Rocky Flats Plant near Golden, Colorado will convert tertiary sewage plant effluent for recycle as cooling tower makeup to reduce external water demand and achieve “zero discharge” off-site of tertiary sewage effluent. Design parameters for the facility, determined by three years of pilot plant testing, include 98% feedwater recovery, 100 ppm T.D.S. product water, and minimum brine production for evaporation to dryness. Pretreatment consists of RO feed attenuation in a large pond, chlorination, sand filtration, softening, diatomaceous earth filtration, feed-water heating and pH adjustment. The RO plant will have three 150 GPM trains, each with a combination of HFF modules producing about 90% of the permeate, followed by SW modules producing the final 10%. Permeate from the SW modules can be combined with permeate from the HFF modules or returned to the RO feed stream. Unique design considerations include heating the 40–70°F fee to 77°F by means of heat recovery from the permeate and supplemental steam heating, recycling of pretreatment backwash streams wherever possible to reduce the volume of brine, and precautions to avoid silica scaling of the modules.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.