Abstract

For the first time, drilling- and velocity-based well analysis and 3D basin modeling were combined to test the predictability and controlling factors of overpressure in the North Alpine Foreland Basin in SE Germany. More specifically, the techniques were tested in the sub-regional context of the deep geothermal well Geretsried GEN-1 (TVD = 4852 m), located in the south of Munich. A 3D basin model based on a total of 20 wells was calibrated to the pressure distribution of four petroleum wells and tested against the Geretsried GEN-1 well. The results demonstrate that overpressure in the North Alpine Foreland Basin SE Germany can be predicted from a simple 3D basin model calibrated to a minimum number of wells. Thereby, disequilibrium compaction likely acts as the main overpressure mechanism in the study area, underpinned by significantly higher sedimentation rates at overpressured locations. 3D basin modeling also confirms the role of Upper Cretaceous shales, which, if present, serve as an important pressure barrier between the under- to normally pressured Jurassic and overpressured Cenozoic basin fill. In addition, overpressure magnitudes of the Chattian might be higher than previously expected. The results of this study have great impact on future drilling campaigns in the North Alpine Foreland Basin in SE Germany. Minimized non-productive time and drilling cost, improved well planning and increased safety are amongst the most important benefits of accurate pore pressure and overpressure prediction. The newly derived insights on the mechanisms of overpressure will greatly influence future geomechanical and tectonic studies, since pore pressure drives rock strength and principle stress magnitudes. Finally, the study is a great example for the importance of an interdisciplinary approach and the incorporation of geological conditions, when investigating drilling-related problems.

Highlights

  • Within any deep geothermal project, the highest risk is in the drilling, both economically and safety-wise (e.g. Stober and Bucher 2013)

  • The results of this study demonstrate that pore pressure can be predicted within an acceptable uncertainty using simple 3D basin models calibrated to a minimum number of wells

  • Drilling histories and velocity-based pore pressure analyses of the Geretsried GEN-1 well and four calibration wells were integrated with a pore pressure-centric 3D basin model in the North Alpine Foreland Basin in SE Germany for the first time

Read more

Summary

Introduction

Within any deep geothermal project, the highest risk is in the drilling, both economically and safety-wise (e.g. Stober and Bucher 2013). This especially applies to deep geothermal projects in basins with very deep target sections and with only a few wells being drilled per year, such as the North Alpine Foreland Basin in SE Germany. Careful well planning and adequate prediction of subsurface stresses and pressures are crucial for a successful completion of deep geothermal projects and deep drilling in general. This is valid in overpressured basins (Mouchet and Mitchell 1989)

Objectives
Methods
Results
Discussion
Conclusion