Abstract

Baganuur Southeast Electricity Distribution Network 15 kV electrical transmission line interruptions research was conducted, and a factor analysis was performed to determine the conditions of the line outage. Due to the neutral grounding of the 15 kV electrical transmission line and the relatively small distance between the line wires and crossbar, there is a high incidence of grounding during the landing and flight of birds, which hurts the reliable operation and ecology of the line. Therefore, the structure of the poles changed, and the results are reflected.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.