Abstract

This paper addresses the problem of scheduling multiple resource-constrained projects with the objective of minimizing weighted tardiness costs. Extending our earlier heuristic scheduling work for production shops, we develop an efficient and effective means of generating low cost schedules for multiple projects requiring multiple resources. A ‘cost-benefit’ scheduling policy with resource pricing is developed which balances the marginal cost of delaying the start of an eligible activity with the marginal benefit of such a delay. A central part of this policy is the heuristic estimation of implicit resource prices, which form the basis for calculating marginal delay costs. The resulting policies are tested against a number of dispatch scheduling rules taken from the project scheduling literature, and against several new scheduling rules, with encouraging results for both the weighted tardiness problem and for the special case of weighted project delay.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.