Abstract

Purpose: When the workflow changed, resource scheduling optimization in the process of the current running instance migration has become a hot issue in current workflow flexible research; purpose of the article is to investigate the resource scheduling problem of workflow multi-instance migration. Design/methodology/approach: The time and cost relationships between activities and resources in workflow instance migration process are analyzed and a resource scheduling optimization model in the process of workflow instance migration is set up; Research is performed on resource scheduling optimization in workflow multi-instance migration, leapfrog algorithm is adopted to obtain the optimal resource scheduling scheme. An example is given to verify the validity of the model and the algorithm. Findings: under the constraints of resource cost and quantity, an optimal resource scheduling scheme for workflow migration is found, ensuring a minimal running time and optimal cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.