Abstract
In order to promote the cooperation between enterprises in networked manufacturing alliance enterprise, and make development and manufacture resource optimally collocate and share among alliance enterprises, and raise the rate of alliance enterprise's development and the utilization of manufacture resource, and reduce the waste for repetitive investment, fuzzy assignment as well as genetic algorithm are adopted in the research of optimal scheduling of resources. Optimal scheduling of product development resources have been described, and mathematical model of optimal scheduling of product development resources have been established. The solving method combining of fuzzy assignment and genetic algorithm has offered according to different objective function. Simulation analysis is used on model and solution algorithm verifying the correctness of theoretical research.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.