Abstract

Construction temporary facilities (CTF) layouts are important in large-scale or mega construction projects, if planned well, are expected to save cost, enhance construction quality and develop operation efficiency. Planning an efficient CTF layout requires the prevention of resource conflicts with other important pre-planning tasks. This paper starts from a specific dam construction project to identify potential conflicts, analyze root causes and their mutual relationships. Based on the identified conflicts and the basic conflict management mechanism, a CTF layout framework is proposed to finalize a CTF layout alternative with the least conflicts between the CTF layout and other pre-planning tasks. By using the framework, a CTF layout is able to be obtained for the specific dam construction project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.