Abstract

One of the important project resources that have been overlooked during the planning phases of most construction projects is site selection of temporary facilities. In some projects, site selection can be as crucial as any other construction resource. Researchers have attempted to put together models that perform or assist planners in site selection. The aim of this paper is to present a framework for utilizing compromise programming (CP) for site selection of Construction Temporary Facilities (CTF) Compromise programming is used as a comprehensive tool that enables comparison between CTF alternatives. The CTF to be located concerns a site selection study conducted to evaluate locations for an onsite concrete batch plant to support the construction of the proposed facilities at the Savannah River Site. A comparison between the proposed model and Analytical Hierarchy Programming (AHP) models recently appeared in the literature is presented. As a construction management tool the proposed methodology describes better the trade-off between engineering performance (engineering, geoscience) and environmental performance (ecology, human health). However, the decision-making is project specific and relies on technical characteristics effectively limited the CTF site selection process criteria and the relative importance (weights) of the different factors involved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.