Abstract
The 12.5 m deep-water channel from Nanjing to mouth in the Yangtze River is a national key channel. This paper analyzed the settlement feature of deep water submerged dike structure in He changzhou waterway section based on in-site tests. The settlement was recorded and a fitting function to predict the long-term settlement was proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have