Abstract

In the special background of social transformation and fast urbanization in China, as a new work, social stability risks assessment of major construction projects has been carried out in recent years. Currently, the research about social risks and social impact assessment has been more mature, but the monographic study of social stability risk assessment in major construction projects has been weak. First, combing the research methods of sociology and the characteristics of engineering objective impact, this article explored some investigation methods of social stability risks for collecting the data needed in risks analysis. Then the project’s social stability risk can be identified in general by summarizing and analyzing. Second, this article adopted the “single factor risk degree method” and “overall risk index method” to calculate the overall risk index of the major construction projects, and working out the major construction projects’ social stability risk level by contrasting “project’s integrated risk judging reference standard”. Third, on the base of the major projects’ participants’ and project phases’ characteristics, this paper designed an organization model of risk assessment and management, and defined responsibilities of all participating unit, which can provided guidance to effectively prevent and managed the social stability risks in major construction projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call