Abstract

Facing the difficulty of construction of viaducts in the central area of the city with short construction period and large daytime traffic. Relying on the Nairobi Airport viaduct project in Kenya, the problems in the construction of this project and the special seismic intensity of the area were analyzed. The key technologies in the design and construction of the bridge substructure using prefabricated assembly technology were studied, and a reasonable substructure analysis was put forward. Block principle and assembly connection plan, and focus on the key construction technology of pier column and cap beam assembly. Through the research on the key technology of substructure design and prefabrication assembly and the application of engineering examples, the problem of viaduct construction in urban restricted road sections in the earthquake zone with moderate intensity is effectively solved.