Abstract

Live replacement of transformers could realize a more convenient way for overhaul and maintenance for this importance equipment in distribution networks. However, a series of harmful impact of transient process may be introduced into the transformer itself and the power distribution system, which would affect accurate measurement and stable operation of the grid. A PSCAD-based simulation model of live replacement for transformers is presented in this paper, and the corresponding method of optimization is also proposed. The scheme presented here is proved to realize live replacement on site, which is significant for improving the level of live maintenance automation and reliability of power distribution systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.