Abstract

With the rapid development of the global economy, wind power generation has attracted wide attention all over the world. With the rapid development of all kinds of new energy in the world, wind power generation has a huge international market and broad prospects for development. Based on the actual situation of the local wind power generation project in a city, this paper analyses the feasibility of the wind power generation system in the local area. According to the type selection and arrangement of various types of wind motors, a reasonable electrical wiring part is designed. The research shows that wind power is of high comprehensive value. Wind power plants can be built in areas with suitable geographical conditions and sufficient wind energy. After the completion of the above power generation projects, the advantage of local wind energy resources will be fundamentally changed into economic advantage.

Highlights

  • With the rapid development of the global economy, the demand for electricity is gradually increasing in every country in the world

  • The wind power generation technology plays a vital role in the rapid development of the national economy

  • The city carries out the planning and construction of the wind power plant project, which will vigorously promote the high speed development of the local wind power plant

Read more

Summary

Introduction

With the rapid development of the global economy, the demand for electricity is gradually increasing in every country in the world. Clean energy, such as solar energy, wind energy, geothermal energy and so on, has been widely recognized and concerned all over the world[1]. The core technology of wind power generation has come to a mature track. The wind power generation technology plays a vital role in the rapid development of the national economy. In the case of high global energy, this technology can meet people's demand for new energy. The city carries out the planning and construction of the wind power plant project, which will vigorously promote the high speed development of the local wind power plant

Type selection of wind turbine generator set
Single machine capacity
Principle of fan layout
Layout scheme
Main electric wiring of wind farm
Electric main wiring of booster station
Electric connection of station
Overvoltage protection
Electric part two
Control system
Relay protection and automatic device
Summary

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.