Abstract

With the expansion of the installed capacity of distributed power generation in China, especially the increase in the proportion of the installed capacity of distributed power generation in some areas to the system load, some potential technical and management problems, and contradictions in the development of large-scale centralized distributed power generation have become increasingly apparent, mainly including distributed power generation, consumption, and safety. Aiming at the distributed characteristics of new energy, this article adopts a multi-agent system in the distribution network dispatching with distributed energy access. The coordination of the multi-agent system can achieve good distribution network scheduling effects, and a single agent can also use its own autonomy and learning experience to participate in the distribution network scheduling. Designed a distribution network dispatching control system based on multi-agent technology and its implementation process. A distribution network example with distributed energy access is used to verify the effectiveness of smart loads in distribution network dispatching.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call