Abstract

The combinative bridge with V-type rigid frame continuous concrete beams and concrete filled steel arch bridge is a hyperstatic structure at internal and external, the construction process is complex, the structure is occurring system transformation with construction process. The tensioning process of hangers has a direct impact on the force of suspender final bridge and the stress state of the structure. The influence of deformation and stress of structure are studied with one-step tensioning and multi-step tensioning, Based on finite element simulation of construction process for the combinative structure with V-type rigid frame and arch of Nianchu River Bridge. The tensioning construction process of suspenders is forward on considering the actual situation of the bridge.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.