Abstract

This paper studies the voltage, phase and current tracking strategy to eliminate voltage and current mutations when the virtual synchronous generator is switching between grid-connected and islanded. By using these strategies the inverter can realize secondary frequency regulation and voltage regulation. If the phase is near 0 or 2π a little disturbance may made the PLL output a big error, so a new PLL is proposed by this paper. A sine module is added in the PLL to avoid this error. In order to verify the strategy proposed by this paper a simulation model is built in Matlab/Simulink. The simulation results show that the control strategy can realize seamless switching.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.