Abstract
In this paper, we take the four-way shuttle system as the research object and establish the mathematical model of scheduling optimization based on the minimum time for the in/out operation optimization and path optimization scheduling problems of the four-way shuttle system. An improved genetic algorithm is used to solve the task planning, and an improved A* algorithm is used to solve the path optimization within the shelf level. The conflicts generated by the parallel operation of the four-way shuttle system are classified, and the improved A* algorithm based on the time window method is constructed for path optimization through the dynamic graph theory method to seek safe conflict-free paths. Through simulation example analysis, it is verified that the improved A* algorithm proposed in this paper has obvious optimization effect on the model of this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.