Abstract

The four-way shuttle-based storage and retrieval system (FSS/RS) handles retrieval transactions through shuttles moving horizontally in four directions and lifts moving vertically. The scheduling process and working route of both are important problems for daily operations. This article constructs a scheduling model for the tier-captive FSS/RS with multiple lifts and designs a two-stage optimization heuristic algorithm (OHA). A heuristic assignment algorithm is proposed to determine the retrieval request sequence, and the route-generation stage adopts an improved A-star algorithm with a multi-phase conflict avoidance method to generate shuttle conflict-free routes. Simulation results demonstrate that OHA can reliably generate high-quality solutions, with a low degree of fluctuation in the results, not exceeding 0.5%. The proposed scheduling method outperforms its competitors in all instances, reducing the makespan by 8%. Moreover, the evidence shows that the proposed method can obtain the most competitive scheduling scheme in FSS/RS with more shuttles and lifts.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.