Abstract

Installation of inter-phase spacer can effectively protects against line fault caused by conductor galloping, non-synchronous swing and sleet jump etc large amplitude vibration, but sag of the conductor is changed if inter-phase spacer is installed. And installation of initial inter-phase spacer will cause change of inter-phase distance, which cause difficulty of successive installation. The empirical equation can’t accurately analyze change of the inter-phase distance caused during installation of the inter-phase spacer. In this paper, accurate conductor installation inter-phase spacer analysis model is established with non-linear finite element method. Change of the conductor sag after installation of the inter-phase spacer is calculated, and influence on inter-phase distance caused by different installation sequence is analyzed. The research result provides effective analysis method for length control of actual line installed inter-phase spacers, and ensures manufacturing and successful installation of the inter-phase spacer.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.