Abstract

In order to solve the problems of prefabricated residential building supply chain, such as more risk factors, high uncertainty and the influence of risk source factors, DEMATEL-ISM method is proposed to analyze the relationship between risk factors. From the outside, management. Manufacturing and transportation, construction and assembly, delivery six aspects of the establishment of risk index system. Combined with the analysis of examples, it is concluded that the total contract management ability and subcontract management ability are the most fundamental influencing factors of the prefabricated residential building supply chain risk, and have a great impact on other factors. Prefabricated installation precision, transfer layer steel bar positioning, delivery timeliness, quality acceptance are the surface factors of prefabricated residential building supply chain risk, and the impact is small. The research results can provide ideas for the correlation of supply chain risk in related projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.