Abstract

With the acceleration of urban construction, the urban electricity load has increased rapidly, and electricity shortages have also appeared in various places. However, the rapid development of cities has resulted in a shortage of land. The location of substations and the selection of transmission lines are particularly important in planning. In this paper, distributed power transmission and transformation project to optimize network access with locating and sizing problems, establish an annual loss of power as the objective, and consider the output load timing characteristics of multi-period optimal power flow model. Use representative scenes to simulate the situation throughout the year, and give a method for determining scenes and their weights.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.