Abstract
In order to ensure the safety of the subway in the process of excavation, combining with the geographical location and geological situation of the project, with the high-precision automatic monitoring system, it sets up the corresponding monitoring points to protect and monitor the subway near the project, so as to ensure the normal construction of the foundation pit Iron impact is minimized. The monitoring results were in line with the requirements of the specification, providing guarantee for the subsequent construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.