Abstract

In order to explore the layout of the underground garage comprehensive pipeline and optimize the layout of the underground, this paper takes the complex large underground garage project as the research background, establishes a 3D visual information model by using BIM technology, and proposes the corresponding optimization principle and optimization process to optimize the design of the comprehensive pipeline in the complex area of the underground garage. On the premise of satisfying the use function of the pipeline and the internal height of the underground garage, it also takes into account the beauty and other requirements. The application of the optimized model in this study to guide construction fully meets the acceptance requirements, reflects the superiority of BIM technology, and has good practical guidance significance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.