Abstract

t is hard to acquire the failure data of ship unloader and the mean time to failure is not independent identically distributed, and there are many defects existed in the maintenance method such as high cost and bad effect. In this work, we propose a method based on Weibull Distribution model to deal with the failure data of a large-scale grab ship unloader, build up the model of MTBF (Mean Time Between Failure) and preventive maintenance time, and show the example with failure data, which provides references to maintenance of the ship unloader. Finally, we present the decision process of the reliability-centered maintenance strategy, maintenance type of the grab ship unloader and the maintenance of the key parts, which provides scientific decision support for the maintenance of the ship unloader equipments.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call