Abstract

At present, the mainstream method of urban subway construction is shield construction. What cannot be avoided in shield construction is the settlement and displacement of the ground surface, and the tunneling pressure is closely related to the grouting pressure and the settlement of the soil. For the overlapping tunnel shield construction, this paper takes the shield construction of the overlapped tunnel section of Kunming Rail transit Line 6 as the research object. Using ABAQUS finite element software to simulate overlap shield tunnel construction, the research of shield tunneling parameters and the relationship between the surface displacement of soil. The results show that reasonable selection of excavation parameters can well control ground settlement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.