Abstract

There are two kinds of bid evaluation methods in China, which are the lowest bid price method and the comprehensive evaluation method. They have their own advantages and disadvantages, and they can’t replace each other. Especially, the applicable scope of comprehensive evaluation method is wide. Quantifying the technical bid and commercial bid weighted, calculating for each bid comprehensive evaluating price or comprehensive evaluation points, and then selecting a high comprehensive quality unit. The paper aims at the particularity of comprehensive evaluation method. Then to study the content of the construction quality management system, the indicators and criteria, which guarantees the quality of the project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call