Abstract
In high gas mines, the safety accidents of coal seam spontaneous combustion and gas leakage in goaf caused by fresh air flow entering goaf due to loose roof connection of filling body beside goaf are easy to occur. In order to solve such problems, this paper proposes the gob‐retaining technology of the “combined” filling body at the side of the roadway. The upper layer of the “combined” filling body is constructed with high‐water material as the “connecting top layer” so that the deformation form of the filling body is consistent with the broken characteristics of the roof, and the lower layer is constructed with concrete as the “supporting layer” to achieve sufficient support strength. The “combined” filling body can not only ensure the stability of roadway surrounding rock but also a timely closed goaf. The gob‐retaining technology of the “combined” filling body was applied in the field of coal mine 2603 working face. Based on the engineering background, the mechanical model was established to calculate cutting resistance of the filling body, and Flac3D software was utilized to optimum parameters of the “combined” filling body. According to the field monitoring results, the “combined” filling wall at the side of the roadway effectively controls the stability of surrounding rock and the gas concentration in the roadway.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.