Abstract
For a long time, the overhead transmission line project budget, completion settlement and financial final accounts are all valued according to the entire line. The project construction management and asset collection have not yet been refined. The management is not separately calculated according to the actual investment of different towers, and cannot be reflected in each base tower. The actual cost level and the accuracy of the cost need to be further improved. Therefore, this paper combines the actual pain points and difficulties of overhead line engineering cost management, and innovatively builds a pricing model based on a single base tower. When the company strengthens the construction drawing budget management, improves the project settlement level, accurately controls risks, and realizes high-quality management of cost management. The level of leanness is of great practical significance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.