Abstract
The process of developing new spacecraft is time-consuming and task-intensive. This paper analyses various problems existing in the application of spacecraft FMEA, and points out that it is necessary to it is necessary to assure the validity of FMEA work, including normative FMEA work carried out in time, comprehensive identification of failure modes and their causes, correct expression of failure modes and their causes and effects, and the pertinence and maneuverability of measures to be taken. Taking the development of Mars rover as an example and considering the actual situation, the assembly process and FMEA agreement are proposed and formulated. According to the development process, the failure modes, causes and effects (severity) of the main processes are analyzed. The risk sequence number (RPN) is obtained by combining the frequency of occurrence and the difficulty of detection. Finally, through sorting out the assembly work and key points in each stage of AIT, 60 processes and 95 failure modes are analyzed, the possible weaknesses are found out, and the control methods and measures are put forward, so that the RPN values are below 12. Improve the quality and efficiency of product development by strengthening FMEA management, and ensure the smooth development of Mars probe on.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.