Abstract

With the rapid development of international engineering quantity and scale, traditional project management methods have shortcomings such as relative separation of project design, construction, and operation, and loose connection of project management links. However, BIM technology can effectively integrate various stages of project management. This article combines the new Phnom Penh Airport project in Cambodia and establishes a BIM design management process based on existing management experience. By analyzing the changes in organizational management, team management, technical processes, and management points brought about by BIM, and addressing the problems in project practice, it summarizes and innovates the project design management process under DB mode, achieving a reasonable connection between design and construction management links.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call