Abstract

This research aims to identify, investigate, rank, and mitigate delay factors perceived to affect private financed residential building construction project in Phnom Penh city, Cambodia in order to recommend actions of how to deal with such delays. To identify and rank delay factors, a questionnaire survey that matches the research preference was conducted. The first round of data collection showed the delay factors ranking through the Relative Importance Index (RII) method. The top ten (10) most critical delay factors were mitigated in the second round of data collection with recommended actions proposed by experts using the Delphi Technique and the Failure Mode and Effect Analysis (FMEA) method. The study results revealed the critical delay factors and their possible solutions. The list of delays affecting private financed building construction project in Cambodia was mainly dominated by the factors related to labor and material.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.