Abstract

With the rapid development of the economy in recent years, economic and trade activities such as foreign exchanges and business exchanges in Shaanxi have become increasingly frequent. As a window and transportation portal of Shaanxi, Xianyang Airport also shows the momentum of rapid growth in the airport's aviation business. At present, the annual passenger throughput and annual flying racks of Xianyang Airport have exceeded the capacity of the design target year. The existing organic apron pipe supply will face the situation of insufficient supply and insufficient supply. According to the actual needs, the expansion of the oil engineering expansion project of Xianyang International Airport has begun to be officially constructed. In the implementation project, the fuel supply project will encounter non -stop construction and oil -with oil. It is the most difficult and most dangerous construction in the construction process of the apron pipeline. During the construction of the mouth, This article discusses the construction technology and standardized construction process for oil welding joints of pipelines during non-stop navigation on the apron.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call