Abstract

As the subject of long-term stable development of the electric power industry, the power grid enterprises areholding the important mission of power transmission. Their secure and stable operations play a very importantrole in the entire electricity production and consumption system. This paper analysed the enormous profit risksof electricity grid enterprises under the influence of implementing the current policy of energy saving and furtherstudied significance of constructing management and control system of electricity bill risks from aspects oforganization and institution construction, reporting system construction, information system construction,supervision and evaluation and continuous improvement mechanism construction, as well as risk cultural systemconstruction. These careful studies will create favorable conditions for strengthening risk management in powergrid enterprises.

Highlights

  • There is the formation of all aspects of enterprise systems and levels, including three kinds of protection to risk management of electricity bill, top-down risk control and risk prediction of electricity bill, the strategic bi-directional parallel electricity bill risk management objective system, all of which will maximize the overall management of electricity bill. 3.2 Construction of reporting system of electricity bill risk management and control Electricity bill risk management reports is the carrier of information and communication of risk management

  • An analysis of the emergency will provide the basis for the electricity bill risk warning information, and is an important component of dynamic monitoring of electricity bill risks. 3.3 Management and control system construction of electricity bill system According to the basic needs of electricity bill risk management, electricity bill risk management system can be divided into five parts as follows: information collection, risk assessment, data dictionary, risk and decision-making and system management information

  • Staff who use the system login name and initial password and give the permissions to a user who will perform the function menu. 3.4 Construction of supervision and evaluation and continuous improvement mechanism of electricity bill risk The object of supervision and evaluation mechanism of electricity bill risk management is to construct machinism of electricity bill risk management, to run internal audit and external audit on operating effects, to put forward the direction of continuous improvement and measures to protect the electricity risk management system when combined with benchmarking experience, all of which will play a strategic role in promoting the achievement of objectives

Read more

Summary

Introduction

This paper analysed the enormous profit risks of electricity grid enterprises under the influence of implementing the current policy of energy saving and further studied significance of constructing management and control system of electricity bill risks from aspects of organization and institution construction, reporting system construction, information system construction, supervision and evaluation and continuous improvement mechanism construction, as well as risk cultural system construction. Electricity bill between power grid companies and electricity tariff customers is settled by "first use, post-paid" model, which result in difficulties for power supply enterprises to recover bills.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.