Abstract
Currently, the construction scale of the highway tunnel in China is in rapid development. As tunnel shop drawings are generated separately and independent by different professions. Highly professional skill is required to ensure effective design review, construction coordination and operation guarantee due to the scattered information. In view of these problems, BIM is introduced in this study to prevent from information islands and improve information interoperability during the whole life cycle for highway tunnel. Based on a mountain tunnel project in Zhejiang Province, this paper presents a BIM-based highway tunnel design, construction and maintenance(DCM) management platform, illustrates data flow and transmission during the whole life cycle for seamless information integration of and the lightweight delivery in operation and maintenance management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.