Abstract
BIM technology has been widely applied to various stages of construction projects in China. The data required at each stage and scenario of construction projects varies, necessitating the definition of target BIM data according to data needs. When BIM software generates IFC models, different MVD templates can be configured to output BIM sub-models. To study the characteristics of data configuration for different MVDs, this article takes construction projects as an example and designs an analysis experiment for BIM sub-model output based on MVD. It analyzes the differences and characteristics of IFC model data from both the overall project level and the professional component level according to key indicators, with the aim of providing references for construction project personnel to select matching MVDs, ensuring the effectiveness of BIM sub-models, and meeting the needs of business scenario applications.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.