Abstract
At present, the real-time data of electric power measurement are not the same cross-section data, which have a large error and affect the analysis effect of various advanced application software. When the power grid fails, such analysis results may cause decision-making errors, thus threatening the safe and stable operation of the power grid. The ACATS algorithm is adopted in the invention, taking into consideration the phase offset, frequency drift and random delay in the process of information transmission. Inspired by the algorithm, the monitoring idea is used to improve the local average clock synchronization method of the nodes in the cluster in the algorithm, reducing the number of information exchanges required in the same step process of the nodes in the cluster, and taking into account the phase offset, frequency drift, and The random delay in the process of information transmission is of great significance to the practical network.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have