Abstract

Abstract Substation has always been the hub of power grid transmission, supply and distribution. Its construction has become a key link in the process of power grid construction. In the operation of the power grid, the secondary system provides the basic guarantee for the safe operation of the substation. The safety and reliability of the secondary work is of great significance to the power grid. In order to ensure the safe and stable operation of the secondary system, the protection still adopts the way of directly inputting the voltage and current of the primary system from the current and voltage transformer, and directly controlling the circuit breaker outlet through the relay. This paper mainly aims at the acceptance status of secondary equipment in the intelligent substation. Based on the analytic hierarchy process for data acquisition, analysis and research, obtain the operation acceptance status of secondary equipment in smart substation and make fault prediction. In the example test, the final evaluation score of the secondary equipment in the smart substation is 97.54, which verifies the accuracy of the fuzzy comprehensive evaluation method. Establish a scientific, consistent, feasible and standard state index for the power system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call