Abstract

The pylon of the Xinshougang Bridge, a welded steel box arch with a variable cross-section, exhibits asymmetrical design and unevenly inclined limb ends. The segmented assembly of this uniquely shaped steel pylon necessitates precise splicing. In this paper, a novel three-point method for segment attitude positioning is proposed based on the local coordinate system. This method facilitates accurate coordinate translation and attitude alignment between the section preparation facility and the construction site. Furthermore, a predictive methodology for segment posture during erection is introduced, aiming to minimize misalignments at the connection interfaces. This approach accounts for potential deviations arising in manufacturing and erection phases. The synergistic application of these methods effectively ensures the precise geometric shape of the bending and twisting steel tower throughout its phased construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.