Abstract

Installing distributed generators can effectively reduce network power consumption and improve power quality in the distribution network, but it will also bring some technical problems. Therefore, we need to study how to efficiently and quickly determine the optimal investment capacity of distributed generators in the distribution network. In this paper, we set the minimization of the power loss as the objective and establish the most investment scale decision-making model of distributed generation access to power distribution system. In terms of optimization algorithm, optimization time of traditional sequential quadratic programming will dramatically increase with the increasing number of variables and restraints. In order to pursue higher efficiency optimization, we apply the improved sequential quadratic programming that is fast sequential quadratic programming method for solving nonlinear problems of distributed generators optimal investment size. We apply the constructed model to systems with different nodes, and the results show that the proposed new optimization method is not only scientific and effective, and can significantly improve decision-making efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.