Abstract
The advanced geological prediction is carried out by using ground penetrating radar, infrared water exploration and seismic reflection method (TSP) for the shallow fractured zone of Laoyingshan tunnel. The prediction accuracy is over 95%. It is suggested that the advanced prediction method can be used in the follow-up similar tunnel projects to improve the information level of tunnel construction and ensure the quality and safety of the project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.